Once the site work, foundation and subfloor are prepared and installed by your contractor, the Appalachian Crew constructs the heavy timber members of your home and finishes out constructing the home “shell”.
The pictures below illustrate this process.
-
Step 1
https://static.alhloghomes.com/uploads/slideshow-gallery/01.jpgALH truck(s) arrive.
-
Step 2
https://static.alhloghomes.com/uploads/slideshow-gallery/02.jpgTrucks are unloaded by our crew and equipment and items accounted for.
-
Step 3
https://static.alhloghomes.com/uploads/slideshow-gallery/03.jpgStack and level logs.
-
Step 4
https://static.alhloghomes.com/uploads/slideshow-gallery/04.jpgAll dovetail corners caulked.
-
Step 5
https://static.alhloghomes.com/uploads/slideshow-gallery/05.jpgAll dovetail corners are spiked.
-
Step 6
https://static.alhloghomes.com/uploads/slideshow-gallery/06.jpgAlignment rods are installed per design.
-
Step 7
https://static.alhloghomes.com/uploads/slideshow-gallery/07.jpgLogs are topped out.
-
Step 8
https://static.alhloghomes.com/uploads/slideshow-gallery/08.jpgLog walls erected.
-
Step 9
https://static.alhloghomes.com/uploads/slideshow-gallery/09.jpgCeiling beams set.
-
Step 10
https://static.alhloghomes.com/uploads/slideshow-gallery/10.jpgCeiling beams set.
-
Step 11
https://static.alhloghomes.com/uploads/slideshow-gallery/11.jpgWiring installed at preplanned locations (by your electrician) and ceiling deck installed.
-
Step 12
https://static.alhloghomes.com/uploads/slideshow-gallery/12.jpgShed dormer walls are built.
-
Step 13
https://static.alhloghomes.com/uploads/slideshow-gallery/13.jpgRafters set.
-
Step 14
https://static.alhloghomes.com/uploads/slideshow-gallery/14.jpgDouble ridge beam for wide spans.
-
Step 15
https://static.alhloghomes.com/uploads/slideshow-gallery/15.jpgCorners are stacked tight.
-
Step 16
https://static.alhloghomes.com/uploads/slideshow-gallery/16.jpgSymmetry designed into system to afford aesthetic beauty.
-
Step 17
https://static.alhloghomes.com/uploads/slideshow-gallery/17.jpgSub-jambs are set for windows and doors.
-
Step 18
https://static.alhloghomes.com/uploads/slideshow-gallery/18.jpgSub-jambs are cut short to allow for minimal settlement.
-
Step 19
https://static.alhloghomes.com/uploads/slideshow-gallery/19.jpgShed dormer wall erected.
-
Step 20
https://static.alhloghomes.com/uploads/slideshow-gallery/20.jpgDog house dormers are set.
-
Step 21
https://static.alhloghomes.com/uploads/slideshow-gallery/21.jpgCollar ties placed.
-
Step 22
https://static.alhloghomes.com/uploads/slideshow-gallery/22.jpgCollar ties bolted.
-
Step 23
https://static.alhloghomes.com/uploads/slideshow-gallery/23.jpgRoof deck installed.
-
Step 24
https://static.alhloghomes.com/uploads/slideshow-gallery/24.jpgInsulation panels applied over builders paper.
-
Step 25
https://static.alhloghomes.com/uploads/slideshow-gallery/25.jpgFront window dormer framed.
-
Step 26
https://static.alhloghomes.com/uploads/slideshow-gallery/26.jpgBuilders paper applied for temporary roof dry-in.
-
Step 27
https://static.alhloghomes.com/uploads/slideshow-gallery/27.jpgBegin 1" log veneer with true dovetail corners at garage.